Miscellaneous
Validators, generators, games, productivity tools, and everything else.
58 tools
Email Validator
Validate email addresses against RFC 5322 format rules with detailed error explanations.
🧰 Miscellaneous
Phone Number Validator
Validate international phone numbers with country detection, formatting, and carrier type identification.
🧰 Miscellaneous
Credit Card Validator
Validate credit card numbers using the Luhn algorithm with card network detection.
🧰 Miscellaneous
IBAN Validator
Validate International Bank Account Numbers with country-specific length checks and MOD-97 checksum.
🧰 Miscellaneous
VAT Number Validator
Validate VAT identification numbers for European and international formats.
🧰 Miscellaneous
URL Validator
Validate URL format and structure with protocol, domain, path, and query string analysis.
🧰 Miscellaneous
IP Address Validator
Validate IPv4 and IPv6 addresses with type detection and range classification.
🧰 Miscellaneous
MAC Address Validator
Validate MAC addresses in multiple formats with OUI prefix identification.
🧰 Miscellaneous
ISBN Validator
Validate ISBN-10 and ISBN-13 book identification numbers with check digit verification.
🧰 Miscellaneous
Barcode Validator
Validate barcode formats including EAN-13, EAN-8, UPC-A, and UPC-E with check digit verification.
🧰 Miscellaneous
Color Validator
Validate color values in HEX, RGB, HSL, and CSS named color formats with live preview.
🧰 Miscellaneous
JSON Validator
Validate JSON syntax with detailed error messages showing the exact location of issues.
🧰 Miscellaneous
XML Validator
Validate XML syntax with error detection for malformed tags, missing closings, and encoding issues.
🧰 Miscellaneous
HTML Validator
Validate HTML structure with checks for unclosed tags, nesting errors, and common mistakes.
🧰 Miscellaneous
CSS Validator
Validate CSS syntax with checks for property names, value formats, and selector structure.
🧰 Miscellaneous
Typing Speed Test
Test your typing speed with WPM calculation, accuracy tracking, and error highlighting.
🧰 Miscellaneous
Click Speed Test
Test your clicking speed in clicks per second (CPS) with timed challenges.
🧰 Miscellaneous
Reaction Time Test
Test your reaction time by clicking when the screen color changes.
🧰 Miscellaneous
Drawing Canvas
Simple digital drawing canvas with color palette, brush sizes, and undo/redo support.
🧰 Miscellaneous
Whiteboard
Digital whiteboard with drawing tools, shapes, text, and eraser for brainstorming.
🧰 Miscellaneous
Sticky Notes
Virtual sticky notes board for organizing ideas with color-coded, draggable notes.
🧰 Miscellaneous
Flashcard Maker
Create and study digital flashcards with flip animation and progress tracking.
🧰 Miscellaneous
Quiz Generator
Create interactive quizzes with multiple choice questions, scoring, and results review.
🧰 Miscellaneous
Decision Matrix
Weighted decision matrix for comparing options across multiple criteria with scoring.
🧰 Miscellaneous
Pros and Cons List
Create a structured pros and cons comparison to evaluate decisions clearly.
🧰 Miscellaneous
Random Decision Maker
Spin wheel decision maker — add options and spin to make a random choice with animation.
🧰 Miscellaneous
Coin Flipper
Animated coin flip simulator with heads/tails tracking and multiple flip options.
🧰 Miscellaneous
Dice Roller
Roll virtual dice with customizable quantity, sides, and animated results with totals.
🧰 Miscellaneous
Random Name Picker
Pick random names from a list for giveaways, team selection, or classroom activities.
🧰 Miscellaneous
Random Group Generator
Split a list of names or items into random groups instantly. Perfect for classrooms, workshops, and team activities.
🧰 Miscellaneous
Random Number Wheel
Spin a virtual number wheel to pick a random number from any range with an animated spinning effect.
🧰 Miscellaneous
Team Generator
Generate balanced teams from a player list with optional skill-based balancing for fair matchups.
🧰 Miscellaneous
Tournament Bracket Generator
Create single-elimination tournament brackets with seeded or random draws and interactive winner selection.
🧰 Miscellaneous
Bingo Card Generator
Generate random bingo cards with custom text or traditional numbers. Print-ready cards for any occasion.
🧰 Miscellaneous
Password Generator
Generate strong, secure passwords with customizable length, character types, and exclusion options.
🧰 Miscellaneous
Passphrase Generator
Generate memorable yet secure passphrases using random word combinations that are easy to remember.
🧰 Miscellaneous
Password Strength Checker
Check how strong your password is with detailed scoring, crack time estimates, and improvement suggestions.
🧰 Miscellaneous
Fake Data Generator
Generate realistic fake names, email addresses, phone numbers, and addresses for testing and development.
🧰 Miscellaneous
Lorem Ipsum Generator
Generate Lorem Ipsum placeholder text by paragraphs, sentences, or words with various formatting options.
🧰 Miscellaneous
Placeholder Image Generator
Generate customizable placeholder images with solid colors or gradients for mockups and prototyping.
🧰 MiscellaneousDead Pixel Tester
Test your screen for dead or stuck pixels by cycling through full-screen solid colors.
🧰 Miscellaneous
Screen Resolution Display
View your current screen resolution, viewport size, device pixel ratio, and display information.
🧰 Miscellaneous
Fullscreen Clock
Display a beautiful full-screen digital or analog clock for presentations and ambient displays.
🧰 Miscellaneous
Countdown to Date
Create a live countdown timer to any future date showing days, hours, minutes, and seconds.
🧰 Miscellaneous
Kanban Board
Organize tasks with a drag-and-drop Kanban board featuring customizable columns and color-coded cards.
🧰 MiscellaneousHabit Tracker
Track daily habits with visual streak counting, completion tracking, and progress visualization.
🧰 Miscellaneous
Pomodoro Timer
Full Pomodoro productivity timer with customizable work/break intervals and session tracking.
🧰 MiscellaneousExpense Tracker
Track personal expenses with category-based organization, running totals, and spending summaries.
🧰 Miscellaneous
Simple Invoice Maker
Create simple invoices with line items, tax calculations, and print-ready formatting.
🧰 Miscellaneous
Meeting Notes Template
Structured meeting notes template with agenda, attendees, action items, and decision tracking.
🧰 Miscellaneous
Project Timeline Generator
Create simple project timelines and Gantt charts with task scheduling and milestone tracking.
🧰 Miscellaneous
Checklist Generator
Create interactive checklists with checkboxes, progress tracking, and easy item management.
🧰 Miscellaneous
Mind Map Template
Create visual mind maps with branching nodes for brainstorming, planning, and idea organization.
🧰 Miscellaneous
SWOT Analysis Template
Create SWOT analyses with organized Strengths, Weaknesses, Opportunities, and Threats quadrants.
🧰 Miscellaneous
OKR Template
Create Objectives and Key Results (OKR) plans with progress tracking and scoring.
🧰 Miscellaneous
Dummy File Generator
Generate files of any specified size for testing uploads, downloads, and storage systems.
🧰 Miscellaneous
File Hash Viewer
Calculate SHA-1, SHA-256, and SHA-512 hashes of uploaded files for integrity verification.
🧰 Miscellaneous
System Info Display
View detailed browser, device, and system information including hardware specs and network status.
🧰 Miscellaneous